Carbon to Nitrogen ratio – Agriculture

Analysis Included

pH, Moisture, Carbon nitrogen ratio C/N, Carbon (total), Nitrogen (total)

Typical Turnaround Time

5 business days

Sampling Instructions

Sample at different depths and location within the pile to obtain a representative sample of the entire pile. Minimum amount of sample needed is 1/2 pound and can be collected into a quart sized resealable plastic bag.